Crew Work Guide

🔒 REAR LOCKBOX: 2751
Questions? Nick — (754) 779-4654
OVERALL — 0 / 0 tasks complete
🏗️ Floors
🪵 Build
🛒 Shop
📹 Videos
🏗️ Floor Prep — Adhesive Removal
Setup
Nick is dropping the floor buffer + Hexpin mastic removal attachment on site. NIOSH masks available in the rolling black toolbox if needed.
Day 1 — Bulk adhesive removed by hand scraping
Run floor buffer + Hexpin over entire floor in slow overlapping passes
Like mowing a lawn — keep moving, don't dwell. Sweep/vacuum continuously. If glue gums up, sprinkle masonry sand on the floor.
Run your Makita + 4" diamond cup wheel along all exterior walls
Cup wheel is in Nick's drop.
Measure rear office room — text dimensions to Nick (for tile planning)
Sweep and vacuum — confirm bare gray concrete throughout
Leave bare — no sealers or chemicals on the concrete.
QC check — water droplet test in several spots across the floor
Drop a few water drops: absorbs immediately = clean and open. Beads up = residue still present, grind that area again.
If Nick brought RAM Board — lay starting at front door, work back until it runs out
Tape all seams.
🪵 Framing, Drywall & Demo
Remove old flooring near doorways and rear walls
Far enough back that baseboard or quarter round covers it. Do this first — clear the path.
Demo the built-in shelf wall in the old bathroom — expose plumbing and electrical
Right back room / abandoned bathroom. Needs to happen before framing so you know what's in the walls.
Frame the double door opening closed — shared wall, 2747 side
2×4 framing, PT sill on slab, studs 16" OC
Frame the single door opening closed — shared wall
Hang drywall on both closed wall openings
3 sheets 5/8" drywall in Nick's drop
Tape and mud — first coat, all drywall joints
Cut the excess metal track past the wall-mounted mirror — flush
Remove bathroom vanity and cap supply lines — do LAST
Use the sink for cleanup throughout the job.
🔧 Repairs & Misc
Put all loose tools into the rolling black toolbox
Move couch out to dumpster area
Replace air filter — new one is on site
Tuck ethernet cable near rear door back into the drop ceiling — tiles only, do not open or disturb the grid structure
Assess back door latch — can it be better secured?
Old and damaged. Rework latch or add metal reinforcement plate? Send Nick your findings + recommendation.
General cleanup at end of job
🔩 Drain Stack Flow Test
Run this after the shelf wall demo — once the plumbing is exposed. Nick supplies the adapter and hose. Text results when done.
If backup occurs
Shut it off immediately and text Nick.
Remove cleanout cap on both ends of cast iron stack
Right back room near electrical panel
Connect garden hose via adapter Nick provides — bathroom supply valve to cleanout (~6-8 ft)
Run water for several minutes — watch both ends for flow and no backup
Drains freely at outside cleanout, no gurgling inside = good.
Text Nick results — flowed freely? Any backup? How long?
🛒 Nick's HD Run — Review & Advise
Text Nick if anything is missing or not needed ↓
x3
5/8" drywall sheets
Closing the two shared wall openings
x1
4" diamond double-row cup wheel (5/8"-11 arbor) — for your Makita
Edge grinding along all exterior walls
x1
Garden hose adapter — sink supply valve → garden hose thread
For drain stack test
TBD
RAM Board floor protection
Lay at end of job if Nick brings it — front door working back til it runs out
On Site
Nick is getting the floor buffer + Hexpin and bringing it to site.
Pearl Hexpin — Floor Prep System Overview
The exact attachment you're using
Hexpin Scrape & Grind Pads — Mastic Removal
Diamabrush Mastic Removal — Rental Demo
42K views
Carpet Glue Remover — Quick Overview
141K views
EDCO — Magna-Blades Tool Overview
Official EDCOusa • 1.2K views
EDCO — Carpet Glue & Mastic Removal (Strip-Serts)
Official EDCOusa • 16K views